Askari Metals Identifies Continuous Mineralisation in Phase 1 Trenching at Uis Project

Askari Metals reports continuous mineralisation at Uis PS pegmatite in Phase 1 trenches, paving way to maiden resource as RC drilling targets H2 2026.

Key points

  • Phase 1 trenches show mineralisation at PS pegmatite.

  • Results include 6,670 ppm Sn; 0.49% Li2O; 465 ppm Ta.

  • Next RC in H2 2026; maiden resource targeted this year.

SHARE THIS ARTICLE