Askari Metals reports continuous mineralisation at Uis PS pegmatite in Phase 1 trenches, paving way to maiden resource as RC drilling targets H2 2026.
Key points
Phase 1 trenches show mineralisation at PS pegmatite.
Results include 6,670 ppm Sn; 0.49% Li2O; 465 ppm Ta.
Next RC in H2 2026; maiden resource targeted this year.